Last revision February 7, 1996 TJD 10095 = January 13, 1996 TJD 10097 = January 15, 1996 Because of an error in specifying the high voltage for Spectroscopy Detector 1 (SD 1) as part of a gain change (SD 1 was to change to 0.4X), it was not possible to calibrate SD 1 during the interval TJD/SoD: 10095/13640 - 10097/85899. The end of the interval was determined by when the commands to correct the high voltage were executed. Therefore, no records exist in the spectral calibration history file for SD 1 for the above interval. Triggers 4342 - 4392 occurred during the interval; included were Gamma Ray Bursts 4350, 4368, 4388.